Through the last week we have completed of installing the manholes:
PS2-6-1 and PS2-6-2 on depth 5.5 M , Furth more , connecting the pipes between them also , backfilling the manholes by the materials with the inspection of the backfilling . as we have done all the jobs , the road was opened .
our aims are to serve the citizens .